As a complete end-to-end solutions provider, we undertook all aspects of the project, from the design and engineering through to the manufacturing, transportation and final installation. Our integrated approach ensured the highest standards of quality and reliability throughout the project, ensuring.
In collaboration with Flatk Wood Fans, we successfully executed the design, manufacture, delivery and installation of a custom designed cutting-edge primary ventilation system for Glencore’s Blakefield South Mine. Spanning over four years, this intricate project encompassed the fabrication of two .
This project included a comprehensive overhaul of the switch room, which had originally been supplied by us in 2007. Our expert team undertook a thorough refurbishment, including servicing of the VVVF Drives, updates to the air conditioning system and enhancement to the fire system, all of which too.